Skip to main content
GoBuildCalcs

Permit Checklist Generator (City-Agnostic)

Generate a maintainable permit intake checklist with required submittal sheets, engineering metrics, field code requirements, and inspection slots. Automated RED/YELLOW/GREEN complexity sizing scales review depth to your project scope.

Permit Checklist Generator Inputs

Structural Intake Scope

Leave at 0 if not mapping spatial expansions.

Live Results

Permit Profile Status

YELLOW

📁 Required Document Submittals

📐 Engineering & Site Zoning Metrics

📋 Field Code Requirements

🔎 Mandated Local Inspections

Standard Trade-Specific Express Application — Scope touches specialized MEP mechanical distribution channels or site flatwork. Most jurisdictions handle these through express electronic sub-trade permits with rapid 3-10 day field turnaround times.

City-agnostic checklist for intake planning only. Confirm submittal requirements with your local AHJ before filing.

How to Use This Permit Checklist Generator

  1. Select your primary project focus type. Choose from HVAC, electrical, plumbing, structural addition, interior renovation, demolition, or concrete flatwork. The complexity engine assigns RED, YELLOW, or GREEN permit profile status automatically.
  2. Enter conditioned footprint area (optional). If your scope includes spatial expansion, enter the conditioned structural footprint in square feet. Leave at 0 for trade-only or non-expansion scopes.
  3. Review the live compliance checklist. The Live Results panel populates required document submittals, engineering and zoning metrics, field code requirements, and mandated local inspections from the unified permit data dictionary.
  4. Track submittals with interactive checkboxes. Check off items as you gather documents and schedule inspections. Changing the project type resets the checklist instantly with zero page reload.

Complexity Matrix & Example

The automated complexity sizing engine maps project types to permit review tracks without manual overrides.

Complexity sizing engine:
  structural_addition | demolition  → RED   (Full Plan Check)
  hvac | electrical | plumbing | concrete → YELLOW (Express Multi-Trade)
  renovation (default)                  → GREEN (Over-the-Counter)

Permit data keys per profile:
  documents[]   — Required submittal sheets
  engineering[] — Calculations and structural details
  zoning[]      — Setback and site envelope metrics
  requirements[]— Field code compliance tasks
  inspections[] — Mandated AHJ inspection milestones

Worked Example

Select "Electrical Modification":

Status: YELLOW (Standard Trade-Specific Express Application)

Documents loaded:
  • Electrical permit application
  • Single-line diagram
  • Load calculation worksheet (NEC 220)
  • Panel schedule
  • Grounding and bonding detail sheet

Inspections loaded:
  • Rough-in electrical inspection
  • Service release coordination
  • Final electrical inspection

Switching to "Structural Envelope Addition" instantly reloads the RED profile with wet-sealed calculation requirements and setback zoning metrics — all checkbox states reset automatically.

Frequently Asked Questions

Is this checklist specific to my city?
No — this is a city-agnostic intake planning tool. It maps common compliance checkpoints across HVAC, electrical, plumbing, structural, renovation, demolition, and concrete scopes. Always confirm final submittal requirements with your local Authority Having Jurisdiction (AHJ) before filing.
How is the RED, YELLOW, or GREEN status determined?
Status is computed programmatically from your project type. Structural additions and demolition scopes receive RED (Full Plan Check). HVAC, electrical, plumbing, and concrete receive YELLOW (Express Multi-Trade Review). Interior renovation receives GREEN (Over-the-Counter Safety Review).
What data categories appear in each checklist?
Each project profile includes five arrays: documents (required submittals), inspections (field milestones), requirements (code compliance tasks), engineering (calculations and details), and zoning (setback and site metrics). Engineering and zoning are combined in the results panel for a unified site review block.
Does footprint area change the permit status?
No — footprint area is optional context displayed when greater than zero. Permit profile status is driven solely by the selected project focus type through the automated complexity sizing engine.
Why do my checkboxes reset when I change the project type?
Switching project types loads an entirely new compliance dataset. Previous checkbox states are cleared to prevent mismatched tracking between scopes — for example, HVAC rough-in items should not carry over to a demolition checklist.

Related Tools

Browse all Utilities calculators · Full directory